179 km Modernization Project – Centro Parrilla Project


179 km Modernization – Centro Parrilla Project Intervention of pipelines located in downtown Medellín, driven by increased commercial activity in the area, through the implementation of trenchless technology. The execution includes three phases: Phase 1: Hydraulic model calibration. Phase 2: Conceptual design, including hydraulic design of the water distribution network. Phase 3: Detailed design.