April 5, 2010
Bonyic Hydroelectric Project


Engineering supervision of construction works and coordination of contractual and technical relationships among the respective contractors. With an installed capacity of 31.8 MW, the project is located in the northwestern region of the Republic of Panama. It includes a reservoir with a useful storage capacity of 355,000 m³ and a total volume of 1,380,000 m³, as well as a 38 m‑high RCC dam, 173 m long at crest level, with a total concrete volume of 89,835 m³.