All projects
Colombia
January 30, 2017
SHP Alejandria


Construction supervision (interventoría) during the execution of civil works, equipment installation, testing, and commissioning of the project. Run-of-river Small Hydropower Plant (PCH), including intake structures, water conveyance system, powerhouse, discharge works, access roads, and supporting infrastructure. The project will generate electrical energy from the renewable resource provided by the Nare River, corresponding to a hydraulic development utilizing a flow rate close to the river’s average (16.60 m³/s) with a gross head of 110.20 m. Installed capacity: 15 MW.